The Nechalacho Project

The Tardiff Deposit

The Tardiff Deposit

One of the World's Largest Rare Earth Deposits

The Tardiff deposit sits at the heart of the Nechalacho Project, hosted near the top of a nepheline syenite intrusion within the Paleoproterozoic Blatchford Lake Igneous Complex, one of the most mineralogically significant geological formations in North America. Mineralisation is defined to approximately 100 metres below surface, making it a near-surface, open-pittable deposit with exceptional scale.

Tardiff hosts a total Mineral Resource of 192.7 million tonnes at 1.3% TREO, containing 2.5 million tonnes of total rare earth oxides. With NdPr representing 25% of total rare earth oxide content, Tardiff carries one of the highest magnet rare earth ratios of any deposit globally.

192.7Mt

Total Resource @ 1.3% TREO

636kt

Contained NdPr

578kt

Contained Nb₂O₅

Drill hole collar plot – Tardiff drilling 2023

Mineral Resource Estimate

JORC-Compliant Resource, December 2024

Reported above a 0.7% TREO cut-off grade and within an optimised open-pit shell. Updated December 2024 and based on 484 diamond core drill holes.

Classification
Tonnage (Mt)
TREO (%)
NdPr (%)
Nb₂O₅ (%)
TREO (kt)
NdPr (kt)
Measured
7.6
1.48
0.36
0.24
112
27
Indicated
41.0
1.29
0.32
0.25
528
131
M + I
48.6
1.32
0.33
0.25
640
158
Inferred
144.1
1.31
0.33
0.32
1,883
477
Total
192.7
1.31
0.33
0.30
2,523
636

Mineral Resources that are not Ore Reserves do not have demonstrated economic viability. Due to rounding, totals may not represent the sum of all components. Revenue in cut-off grade calculation is attributable to Nd₂O₃ and Pr₆O₁₁. Refer to the Compliance & Disclaimers page for the full JORC Competent Person statement.

July 2025 Scoping Study

Tardiff Scoping Study Delivers Robust Financial Outcomes

Pre-Tax NPV₈%
US$ 0 M
Pre-tax, ungeared
Pre-Tax IRR
0 %
Pre-tax, ungeared
Post-Tax NPV₈%
US$ 0 M
Post-tax, ungeared
Post-Tax IRR
0 %
Pre-tax, ungeared
Payback Period
0 months
From first production
Initial Mine Life
0 years
56ktpa concentrate · 26.4% TREO

NdPr breakeven price of US$33.68/kg against a base case assumption of US$90/kg — nearly 3× headroom.

Niobium assumed at 0% payability in this study. That upside is not yet in these numbers.

Development Pathway

Advancing Tardiff to Pre-Feasibility

1

Metallurgy Optimisation

Further test work targeting improved TREO recoveries, confirmed niobium payability and established zirconium payability.

2

Infill Drilling & MRE Update

Targeted infill drilling to convert Inferred Resources to Measured and Indicated, supporting a longer mine life and expanding project economics.

3

Infrastructure Partnerships

Collaboration with Indigenous communities and logistics partners to formalise the barging and rail solution via Great Slave Lake to Hay River and the Canadian National Railway network.

4

Pre-Feasibility Study

Incorporating the updated Mineral Resource Estimate and results of project optimisation.